FN-43 · field note
How do you decide which marketing channels to scale next year, and when?
Every fall I rebuild next year’s marketing forecast from the ground up, one lead source at a time, and the number I trust most isn’t cost of marketing. It’s cost per demo.
Get my free auditListen to this Field Note on The Capstone Brief
How should a home services contractor forecast next year’s marketing by channel?
Pull a full year of every lead source through every sales stage, price each stage, and decide channel by channel and quarter by quarter where to scale, hold, or cut. Start with cost per demo, check cost of marketing against a healthy band, and write down what happens to the forecast if each assumption is wrong.
Why I build the forecast from lead sources, not the budget.
A budget built from last year’s budget carries last year’s mistakes forward. A forecast built from leads, demos and sales by source shows where the money turned into jobs. At Integrity Home Exteriors, a Northwest Ohio home services company, the forecast starts with two Lead Perfection exports: Set Appointment Statistics by Sub-Source and Cost of Marketing by Source. Everything else is built on top of those two reports.
Step 1: Every source, every stage, for the whole year.
For each sub-source I want six numbers: leads received, leads set, appointments confirmed, demos in the home, closes, and net revenue. Sub-source, not source. “Google” is a dozen different things, and the paid search line and the organic line do not deserve the same decision.
Before I forecast anything, I reconcile. Every year’s parsed rows have to add up to the report’s total row. If they don’t, that’s a data problem, not a forecast result, and it gets fixed first.
Step 2: Price each stage.
Then cost per lead, cost per demo, and cost of marketing by sub-source. Cost of marketing is total marketing cost divided by net revenue. The band I use: 10 to 15% is healthy, 15 to 20% gets a closer look, over 20% is a red flag.
Step 3: Read cost per demo before cost of marketing.
This is the part most forecasts get backwards. Getting into the home is the hardest part of the whole process. Once a rep is in the living room, the sales team closes from there.
So if a channel’s cost of marketing is out of line but its cost per demo is good, I keep scaling and testing it. A bad close rate or a slow quarter can push cost of marketing up on a channel that’s doing its job.
There’s one exception I check every time: job size. If a channel’s demos are mostly small repair jobs, a good cost per demo is hiding a bad channel. Look at what the demos turned into before giving a channel credit for them.
Step 4: Give every source a verdict.
Each sub-source gets one word and one sentence. The words I use are Invest, No Change, Decrease, Investigate, and Pause. The sentence is the reason. “Investigate” is the most useful one, because it says the number looks wrong and somebody needs to find out why before money moves. A source with record lead volume and almost no demos is an Investigate, not a Decrease, until someone pulls the dialing reports.
Step 5: Split the year by quarter.
The same channel can be efficient in April and a waste in December. So I run the same lead-to-sale math by quarter and by month, and decide when to scale spend up and when to trend it down, channel by channel. Some channels go dark for a season. Some only make sense when crews are on jobsites. The goal is that every channel runs during the months it’s efficient and doesn’t run during the months it’s not (Which months should a contractor advertise, and which should go dark?).
Step 6: Build the number from goals, and carry this year’s efficiency.
Each source gets a spend goal and a net revenue goal. Where I leave a goal blank, the model fills it in at this year’s spend and this year’s net revenue per marketing dollar, not a five-year average. A five-year average blends in channels, vendors, and ad creative that no longer exist. Sources with no spend, like repeat and referral, stay flat unless there’s a reason to move them.
Step 7: Write down what happens if you’re wrong.
Next to every big driver I write what the forecast assumes and what the total does if that assumption misses. Paid digital efficiency reverting. Average ticket not growing. Cancellations running higher. It turns the forecast from one number into a range, and it tells leadership which assumption to watch first.
I also keep a “not in the number” list: new channels, storm work, pricing changes, anything the model doesn’t count. If it isn’t on the list and isn’t in the model, nobody gets surprised by it later.
Step 8: Rank the scale-up moves.
Anything that could be added on top of the plan goes on a ladder, sorted by the cost of marketing the new dollars are expected to run at. The cheap moves go first. Each row shows what it does to the blended number, so the conversation becomes “how far down the ladder do we go,” not “should we spend more” (How much marketing can a contractor add before the percentage breaks?).
Where this is wrong.
Last-touch attribution undercounts brand spend. When TV or radio does its job, a lot of the credit lands on Google organic or repeat, and a forecast by lead source will always make broadcast look worse than it is (Why does my CRM say radio and TV don’t work?). In our data, streaming and broadcast TV also can’t be separated, so the TV line is one decision, not two.
Costs post as invoices arrive, so the most recent months always look cheaper than they’ll end up. Read the last quarter with that in mind.
And the forecast says nothing about whether the crews can install the work. Sales can grow by decision. Production can’t.
What to do.
- Tonight: export last year’s set appointments by sub-source and add one column, cost per demo. Sort it. The top five and bottom five are your first conversation.
- This quarter: give every sub-source a verdict (Invest, No Change, Decrease, Investigate, Pause) with one sentence of reasoning, and check each Decrease for job size and cost per demo before you cut it.
- Ongoing: run the same lead-to-sale math by quarter and set when each channel scales up and when it trends down. Write the dates down before the vendor renewal conversation, not after.
Sources: Forecast method as described by the author (D7 founder story answers, 11/1/2026). Step structure follows the author’s own forecast and mid-year review workbooks at Integrity Home Exteriors; no figures from them are published here. Report names are Lead Perfection’s. The 10 to 15 / 15 to 20 / over 20 cost of marketing band is Capstone’s working standard, not an outside benchmark.
Related notes.
Want these numbers run on your own books?
The free marketing audit pulls your cost of marketing, cost per demo and net revenue by source from your CRM and puts them on one sheet.
Get my free audit